R (Cawley) v Parole Board [2007] EWHC 2649 (Admin)

Revision as of 22:35, 22 February 2008 by Jonathan (talk | contribs) (New page: ''The portion of the delay in arranging a hearing which was attributable to the shortage of Parole Board members, a shortage not peculiar to this case, was unjustified under Article 5(4), ...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

The portion of the delay in arranging a hearing which was attributable to the shortage of Parole Board members, a shortage not peculiar to this case, was unjustified under Article 5(4), but no order for damages would be made; the majority of the delay was the claimant's own fault.

External links

Bailii